MULTIROCK: ECO treatment modules - parallel installation.

When installing the ECO -5000 treatment units in parallel, large sites can be serviced: 60, 90, 120, 180 (EH), etc.

ECO-5000 modules can be installed in parallel after the primary settler . The primary settler is followed by a FCC and a Flow Separation System (SB). The FCC acts as a " balancing tank " to supply a burst flow through the SB and ensure a uniform flow through each of the BIO modules . Combinations of several SBs are used in case of flow separation when more than 3 modules ( bioreactors ) are installed in parallel .

Revolutionary Technology

Sewage Solutions BIO modules are complete wastewater treatment plants (WWTPs) providing quality that is compatible with the highest standards. Bio-treatment technology requires no electricity or moving parts. As a result; maintenance and operating costs are particularly low and reliability is maximized. The modules are built in durable HDPE tanks with lightweight, low profile access caps. WWTPs are shipped as a complete kit for easy installation. BIO modules use a unique, fixed feature biofilm technology with specific functions to achieve a odorless purification effect to a level suitable for irrigation or reuse as "industrial water". Due to the high quality of the treated water, they can be discharged into the "sensitive area" receiver if necessary.

MULTIROCK
CAPACITY
Capacity EZ > 30 inhabitants
ECO -5000 treatment units in parallel, large sites can be serviced: 60, 90, 120, 180 Bioreactors for a small wastewater treatment plant for up to 300 people
ECO -5000 treatment units in parallel, large sites can be serviced: 60, 90, 120, 180 Bioreactors for a small wastewater treatment plant for up to 300 people
MULTIROCK: ECO treatment modules - parallel installation
MULTIROCK: ECO treatment modules - parallel installation

Address

1 Pirin Planina
7800 Popovo,
Bulgaria


Contacts

Email: John@nyamaproblemi.ltd
Phone: +359 (0) 608 411 00